OUR PROJECTS

Residential Rock Delivery – Belleville, IL

Client: Homeowner

Location: St. Clair County, IL
Services Provided: Rock delivery and site preparation

PLG coordinated the delivery and precise placement of 35 tons of minus 1 rock for a homeowner’s property upgrade. This small-scale residential project demonstrated our ability to handle materials with care, communicate clearly with non-commercial clients, and deliver quality results on tight turnarounds.

Our crew managed the delivery logistics, on-site spreading, and clean-up — leaving the property level, stable, and ready for use.

Word of Faith Ministries Grounds Restoration

Client: Non-Profit Organization
Location: St. Clair County, IL
Services Provided: Seeding, sodding, erosion control

A local non-profit organization partnered with PLG to restore green space around its church campus following excavation and grading work. We provided seeding and sod installation across over 10,000 square feet, ensuring proper soil compaction and water coverage for lasting growth.

The site was transformed into a clean, welcoming green space that matched the ministry’s aesthetic vision while meeting stormwater control needs.

Traffic Control Support for Residential Upgrade Resurfacing

Client: PCM Construction, Maintenance, and Design
Location: St. Clair County, IL
Services Provided: Traffic control, certified flaggers, road signage, material transport

PLG was subcontracted by PCM Construction to provide traffic control and logistics support for a residential upgrade project located on a busy roadway in St. Clair County. Due to the property’s location and the scope of exterior improvements, the work zone required IDOT-compliant safety measures to ensure smooth traffic flow and protect both crews and drivers.

PLG supplied certified flaggers, temporary signage, and scheduled deliveries of materials to minimize congestion and reduce risk of accidents. The project was completed with no safety violations or delays, and our team was recognized for responsiveness and flexibility in adjusting to on-site conditions and timeline shifts.